Roltrader / Orchestra
Run: for the programme while it is under way

Run the programme on its own record: decisions, owners, gates and status.

Orchestra is the delivery cockpit for an ERP programme under way. It holds the decisions, owners, conditions and gates in one place, links each gate to the evidence behind it, and computes the status from what the programme has recorded.

Status computed from the programme's own recordA missing fact reads Not capturedOne switch blocks every external AI call
Watch it work

Run it on evidence, in under two minutes.

Roltrader Consultancy Group · 1:34 film · the company shown is fictional  ·  Open the film page

What it does

Nine things a programme gets from its own record.

Grouped by what the reader gets. Orchestra records and surfaces; a named person decides. Every reading is from what the programme has entered or declared: what is missing reads Not captured, and a date-based reading needs the as-at date the client sets (without it, Not assessed).

One place to run it

The programme, the journey and the people in one cockpit

  • Projects: a portfolio of programmes, one cockpit per programme.
  • 14-stage journey with a playbook for each stage, and a Work & Test Plan holding every task and test.
  • Workstreams: functional lanes (Finance, Logistics, Data, Technical, Change and so on) beside the stage; deleting a lane un-assigns its tasks.
  • Team Directory: each role the programme needs, the person assigned, the stage the role is needed from, and whether it is filled or vacant against a baseline set of roles.
  • Participants (stakeholder register and roles) and project access roles: owner, admin and member, with the last owner protected.
  • Toolkit: four meeting agendas computed from the project's own rows (steering, kickoff, RAID review and capacity), with optional model wording polish on three of them and an AI-drafted email and deck outline.
  • Migration Guide: templates at eight of the 14 stages, including SI evaluation, fit-to-standard, UAT planning, go/no-go and the structure of the cutover runbook.
  • My role: a card for each internal team member, with project search and a notification bell. An assistant, a digest and the drafts use a language model only through the deployment's own key, and one switch turns it off.
  • Lessons & Check-in: captured learning and cadence check-ins.
  • Calendar feed: every open task and test with a due date, plus the target go-live, for the team's own calendar app, each date falling on its day in the project's own time zone.
The record of decisions

Who decided what, why, and when it is due for another look

  • Decision Log linked to tasks and RAID. A later change supersedes an entry.
  • Review plan on a decision: kind of choice, who accepted it and when, a review date, reopen triggers and checked items. The owner says a trigger fired.
  • Decision source: the proposing party, the challenging party (a role or a forum) and a pointer to the minute or ticket where the exchange is written down.
  • Business owner role on a decision, entered as a role.
  • Decisions with no named decider: a count and a list, oldest at the top. An empty log reads "No decisions recorded".
  • Decision turnaround: days from an item being raised to the decision that settled it, from Orchestra's own RAID log and Decision Log.
  • Scope changes against approvals: the changes the client declares as scope, read against decision links and approval outcomes.
  • Assumptions that carry weight: for each RAID assumption, days open, whether a validation reference is recorded, the decision against it, the commitment declared and what rests on it.
  • Programme Recovery plan imported as one re-baseline decision, its tripwires as the reopen triggers, with RAID items and budget lines; a tripped tripwire states whether a decision is recorded against it. See PRAIS.
Owners and cover

Who is accountable, and who can step in

  • RACI & Commitment: an enforced accountability grid, with escalation-response and change-approval timing from the record.
  • Key-person reading: for each critical process, integration, interface or report the client declares, the roles able to run it, a runbook reference and whether a second role has tested the runbook. A role counts with a reference; a missing one reads Not captured.
  • Skills depth: for six skill areas (data engineering, ML and model operations, prompt and agent design, product ownership, integration, security), the roles declared as holding each and how much of their time is already committed elsewhere. Roles are listed.
Gates and conditions

A gate rests on evidence, and an override leaves a trace

  • Evidence-linked stage gates: a deliverable is tied to the matching Assure or PRAIS reading (for example the business case against the PRAIS baseline, mock reconciliation, the cutover gate, value realisation, integrity drift).
  • Overrides need a written reason and are recorded where everyone can read them.
  • Acceptance Criteria: the business owners' own criteria as a versioned register, traced to test results by id. A criterion reads Met when every linked test's latest run passed with a run reference; a gap view shows what is missing.
  • Cutover Runbook: the ordered, timed steps for go-live night, each stamped with its actual start and end so overrun shows against plan, with rollback-trigger steps flagged.
  • Defect Register: severity, a retest lifecycle and a measured response time. A downgrade needs a written reason, and from Critical a named approver; every change is kept.
Registers the client keeps

Definitions, exceptions and AI connections, versioned

  • Definitions & KPIs: the client's own business definitions, with calculation, source, named owner, date last agreed, control and the decision each supports. A change supersedes and the history is kept; a change after a supplied design freeze with no approval reference is flagged.
  • Exception Register: each change is a new version with history. A Due for review view lists approved or implemented exceptions that are overdue or have no review date; an optional import reads the client's own exception or change-request list as proposed drafts.
  • AI Connections: the client's declared AI connections into its ERP, each change a new version, with a Due for review view. Shown as declared.
Testing AI agents in the ERP is Assure's work →
Status you can trust

A status that computes itself, and says Unknown where there is no data

  • Mission Control at the top of each project: a progress ring and four RAG dimensions (schedule, budget, risk and team) with a trend arrow and attention items, from the same rule as the Status Report.
  • Status Report: board-ready status computed from the record across schedule, budget, risk and team. A dimension with no data reads Unknown. The saved report downloads as a PDF identical to what is stored.
  • Budget: lines with a budget amount, the spend entered against each, and a note.
  • RAID & Change Log: risks, assumptions, issues and dependencies.
  • Schedule Risk: the forecast finish from the dependency chain and the dates entered, as a slip or headroom in days against the committed go-live. Each conflict names its tasks and dates.
  • Schedule cockpit: move one task, re-plan a task and everything after it, or move the go-live, and see the recomputed slip. A model under changed dates.
  • Pulse Check: team and delivery health.
Early signals

Doubt and worry, in the team's own words

  • Steering Signals: reads the free text the programme already stores and flags eroding confidence, deferral, overload, and a green delivery status over a worried team. Every signal quotes the exact sentence.
  • Anonymous mode: signals, headlines and evidence are shown anonymously.
  • Meeting Minutes: paste the notes and the action items are extracted verbatim, each with the source line quoted and an owner or date where the line itself gives one. A person turns each into a task or dismisses it.
  • Open voice: people answer a short set of questions and may add a comment, a concern or something that is working. Results are counted by area; an area or kind of comment with fewer than five responses is withheld. Anonymous by design.
  • You said, we did: the programme's reply in the owner's own words, with a status, a named owner and a reason when declined. A line reaches the public page when the owner publishes it.
  • Invitation: text with a QR code for each area and for the programme.
Readings of what the client declares

Data sources and the trail of origin

  • Data sources, one by one: five criteria for each source the client lists (completeness, duplicates, consistency, accuracy, traceability). The worst criterion decides, and a source reads Ready once every criterion is assessed.
  • Lineage and parallel sources: per domain, the unofficial copies and side workbooks the client declares, and the trace of origin and transformation.
Where it runs

On the client's own machine, with external AI off by default

  • AI egress switch: one switch blocks every external AI call in all four Orchestra variants, and a badge in the app shows blocked, possible or no AI path.
  • Client edition for Windows and Mac: Orchestra keeps its data in an embedded database in the user's own folder, so the data stays on the machine.
  • AI project context: the text the in-app AI assistant is given about a project is built from the project's own rows, and every count in it equals what the project's own tabs compute.
  • Delivery-tool exports (Jira, ServiceNow, Planview and SAP Cloud ALM export shapes) are read from a file in Keystone, which embeds Orchestra as its delivery workspace.
Who benefits

What each reader gets.

Every benefit below is something the output itself contains.

The programme sponsor

The true status, and a trail of who decided what

“Is the status I am shown the true one, and who decided this?”

  • A status computed from the record across schedule, budget, risk and team, with Unknown where nothing is entered.
  • A Decision Log with who decided, when and a review date, and a list of decisions with no named decider.
  • Scope changes read against approvals, so a change with no decision or no approval outcome is listed.
  • Steering signals that quote the team's own sentences, including a green status over a worried team.
The delivery team and SI

What is expected of whom, and what is in the way

“Who owns this, what is blocked, and what do we do at go-live?”

  • A 14-stage playbook and a work and test plan with every task, test and dependency.
  • A RACI grid and a Team Directory showing vacant roles against a baseline set.
  • Named schedule conflicts: the tasks and dates behind each slip.
  • Meeting actions extracted with the source line quoted, and a timed cutover runbook with overrun against plan.
The board member or assurer

A record each status and gate can be traced to

“Can I follow this status and this gate back to what was recorded?”

  • Gates tied to the evidence behind them, with every override and its written reason on view.
  • A history that keeps every version on decisions, definitions, exceptions and AI connections: a change adds a version and the earlier one stays.
  • Acceptance criteria traced to test runs by id, with a gap view.
  • Each reading separates what was declared from what has a reference, and shows Not captured where nothing was given.
Potential use cases

Three potential situations.

Potential scenarios of the kind of situation the product is used in, described without naming any company or customer.

A green status, a worried team

The report says green, the notes say otherwise

Imagine a steering committee that is shown a green delivery status while the team's own task comments and check-ins keep returning to doubt and deferral.

The product shows
The status computed from the record, and steering signals that quote the exact sentences, with a flag where a green delivery status sits over a worried team.
What happens next
The sponsor puts the quoted sentences to the named owners, and the status is read again after they respond.
A gate before go-live

The cutover gate and the evidence behind it

Imagine a programme approaching go-live whose cutover decision is tied to a reading that has not been brought into Orchestra, or that reads No-Go.

The product shows
The gate checked against that reading, a timed cutover runbook with rollback-trigger steps, and the defect register with its retest lifecycle.
What happens next
The accountable owners either wait for the reading or record an override with a written reason that everyone on the programme can read.
A scope change nobody can trace

Agreed in a meeting, queried months later

Imagine a change to scope that was agreed in a workshop, and later someone asks who approved it and where it is written down.

The product shows
The declared scope changes read against decision links and approval outcomes: both recorded, a decision with no approval, an approval with no decision, or neither, with the pointer to the minute where the exchange is written.
What happens next
The owners add the missing link or outcome as a new version, and the earlier record stays visible.
What goes in

What the programme enters, and what the client declares.

1. The programme's own recordTasks, tests, RAID, decisions, the RACI grid, budget lines, check-ins, pulse notes, lessons and meeting notes, entered by the team in the app.
2. Evidence from other suite productsAssure and PRAIS readings brought in through the evidence contract, and a Programme Recovery plan from PRAIS, imported as a record.
3. The client's files and declarationsAn exception or change-request list (CSV), a definitions register (CSV, xlsx or JSON), AI connection files, acceptance criteria and test results, data-source export rows, critical items, skills and lineage, each with its reference.

The client declares. The as-at date, the project time zone and any review window are set by the client. The same inputs give the same readings, and where an input is missing it reads Not captured or Not assessed.

How it fits the suite

Run: it carries the decision into delivery.

Orchestra is the Run product of the suite. PRAIS (Decide) supplies the baseline a business case is signed against and, with its Programme Recovery add-on, a plan Orchestra imports as a record. Assure (Prove) supplies the readings the stage gates are tied to. Sustain (Drive) holds the promise after go-live. Keystone embeds Orchestra as its delivery workspace. An optional add-on, IVAR, can seal an Orchestra gate verdict into a receipt that verifies offline; it is a seal of the computation.

A walkthrough on your terms

See Orchestra on a sample programme.

Licensing terms are discussed directly.